DOCUMENT GENERATOR

BOQ

Prepare a Bill of Quantities with project details, measurable volumes, units, rates, and calculated totals.

FREEUNLIMITEDNo credit card
☷
Display SettingsChanges appear instantly
▦
Document Template DesignerChoose a visual style; every field and form position remains safely preserved.
1

Document Identity

Logo, title, and document number

2

Company & Project Information

BOQ preparer, project owner, and work location

3

Document Details

BOQ date, work stage, validity, and project reference

4

Bill of Quantities

Maximum 20 rows

Customize column namesOptional · open only when needed
Description / SpecificationVolumeUnitUnit rateTotal amount
Rp 0
5

BOQ Summary

Calculate volumes, rates, tax, discount, and project support costs

BOQ subtotalRp 0
BOQ TotalRp 0
6

Notes & Specifications

Enable notes or terms only when needed

7

Signature

Add a signature and responsible person details

Signer 1
Up to 3 signers, precisely aligned on the document.
Browser Form HistoryYour latest entries are saved and loaded automatically only in this device browser until you select Clear history.
Automatic saving is active
DOCUMENT GUIDE

About this BOQ generator

Build a professional Bill of Quantities for construction, engineering, procurement, or service projects. Record specifications, measurable volumes, units, unit rates, and total amounts with automatic calculations and a live PDF preview. FariDocs keeps lengthy descriptions readable and produces a structured BOQ that supports estimation, comparison, approval, and project control. Review every detail before the final file is downloaded or shared.

FAQ · BOQ

BOQ questions and answers

Practical answers specific to the purpose, references, calculations, and approval of this document.

What does volume mean in a BOQ?+

Volume is the measurable quantity of work or material—such as meters, square meters, units, or hours—multiplied by the unit rate.

Can a BOQ be used outside construction?+

Yes. It suits engineering, installation, maintenance, events, or services with measurable components.

How does FariDocs calculate a BOQ value?+

Each volume is multiplied by its unit rate, then optional discounts, tax, and related costs are applied.

What should be reviewed before BOQ approval?+

Review specifications, units, volumes, unit rates, assumptions, exclusions, tax, and estimator or approver signatures.